Fan coil - FP-KM4(Alloy Cover)
Description:
Working principle
and features:
The fan coil unit (FCU as below) have no energy itself
but through pipeline of central air conditioner supplying with chilled or cooled
water into the copper tube of heat exchanger inside house, and the fan blow
through the heat exchanger to cool or heat the temperature of the house. The FCU
is characterized with energy-saving, high efficiency, low noise, reliable and
convenient to select and install.
Application scope
The unit is widely used together with central air conditioning system in
hotel, hospital, medicine factory, theater, commercial building, office
building, enterprises, chemical industry, exhibition room, research institutes
and so on.
Rating capacity:
Cooling:Inlet air dry-bulb
temperature 27'C;wet-bulb temperature 19.5'C;inlet water temperature 7'C;outlet
water temperature 12'C.Heating:Inlet air dry-bulb temperature 21'C;Cooling water
inlet temperature 60'C; working
pressure:1.6MPa.
Size:FP-34KM4,51KM4,68 KM4,85 KM4,102
KM4,136 KM4,170 KM4,204 KM4,238 KM4.
Tube size:inlet/outlet
water pipe RC3/4 Condensing drain pipe R3/4
Installation, use
and maintenance
Installation of unit
1. The unit shall be installed by professional personnel.
2. The
fan coil unit shall be handled with cares and protected from heavy compression.
Handling the unit with hand holding the impeller or spiral case shall not be
allowed.
3. Before installation, the unit shall be checked for damage.
In case of collision damage, deformation or dropping of fan motor, please
contact the dealer for repair or replacement.
4. For safety, the
lifting apparatus for the unit shall be sufficiently strong to bear running
weight and vibration. The unit is merely allowed to bear its own weight and
shall not be stressed by air pipeline and water pipeline or other external
objects. The unit shall be kept level, or the condensed water would overflow.
Connection of pipeline and anti-frosting measures
1. The water inlet and outlet pipelines shall be connected carefully and
the torque shall not exceed the specified value. It is recommended to seal the
connections with sealing tape to avoid torsion-generated leakage.
2.
The water inlet and outlet pipelines shall be thermally insulated to avoid
generation of condensed water.
3. The condensed water pipeline shall
have drain slope of at least 0.005 to facilitate draining of condensed water.
Electrical connection
1. The unit shall be wired
as per the instruction of connection box and the unit is fed from 1/N/PE AC 220V
50Hz power and the power voltage shall not exceed the rated voltage by 10%.
Excessive high voltage would result in increased noise, too low voltage result
in insufficient air flow rate, and fluctuating voltage result in damage of
motor.
2. If case of in-gang operation of several units with a common
switch, it is merely applicable to units of same model and specification and
their wiring shall be correct and consistent, otherwise, the motor would be
burnt out. For the sets of in-gang units, the capacity of the switch shall be
considered. In-gang operation of units of different models or specification
shall not be allowed.
Requirements of water supply
1. The cooling water and the hot water for the unit shall be softened
water of temperature not below 5'C and not above 80'C respectively and the water
shall be clean. Steam shall not be used.
2. Before initial running, the
water inlet and outlet valves and the washing water system shall be at first
closed and then the valves opened. The system water outlet shall be fixed with a
filter to avoid foul or blocking of coil.
Frost crack prevention
1.In case of
external temperature below 2'C, even under shutdown state the water inside the
coil shall be still kept at circulating.
2. In case of shutdown in winter,
all circulating water shall be completely drained from the unit and its pipeline
of water system.
Use and maintenance
1. In order
to keep air and coil clean, at installation the air inlet of air duct shall be
fixed with air filter or our filter and the filter shall be regularly cleaned.
2. After installation, the fan coil unit shall be checked for friction
noise through slightly rotating its fan impeller and after no friction noise
detected the unit may be switched on.
3. At initial running and
change-over of hot/cold water, the vent valve shall be opened to discharge air
from coil. After escape of water, the vent valve is re-closed; otherwise, the
heat-exchange effect would be impaired.
4. In case of trouble, the
unit shall be repaired by professional personnel.